NWSM loads 300,000 pound vessel on barge

Heavy Equipment Barge MoveThis 102 foot long main control structure is part of the first wave energy device to be placed in operation in North America.  It is being moved from the fabrication facility in Vancouver, Washington to a floating drydock where it will be launched in the waters off the Oregon coast.

Site by CIWD Web Design Portland